About the Amarube iron bridge
Actual size

In the Amarube iron bridge, the length of a bridge pier has completion and opening of traffic what and no less than 41.45m, and 310.59m and height of groundbreaking will be the No.1 scales of Japan in March, Meiji 45 in December, Meiji 42. Supporting the bridge of length like this is being continued by 11 sets of bridge piers. Moreover, it is said that construction of this Amarube iron bridge was the greatest difficulty construction in San'in Line, and two laborers died during construction and it was injured in 83 persons. San'in Line is scheduled to carry out whole-line opening of traffic of this difficulty construction at the last at last.